BLOG

>> Update on the 121 Bobber…

Powder coating on the frame needed a touch up, so I’m still waiting on that.  All the little bits are done and ready to be bolted on. As for the paint its going along beautifully, thanks to Steve at Flame Thrower Customs.  Steve is going to finish the tins up with a bold outline of silver […]

>> Slowly but surely…

It’s the end of April on Colorado, and we just got hit with 6 Inches of snow.  IT WAS JUST 80 degrees last week!! But waiting on the roads to clear up and dirt to be removed from the shoulders, gives me time to complete the bobber. Right now Flame Thrower Customs in Ohio, is […]

>> 121 Custom Bobber…status

Well she is all apart… Very excited to see what this paint and powder coat is gonna turn out like. Powdercoat should be back in two weeks, Paint was sent to Flame Thrower Customs in Ohio, and the pipes are off for ceramic coating. Little sneak peek at the rear fender…

>> Shop Status…

Been awhile since I’ve posted last, so here is a quick update on what’s going down at 121 Customs/Tonup Boulder. 121 Bobber project:  Everything is out for paint, powder, and ceramic coating.  Very excited to see what everything will look like when it gets back. Top end of the motor is getting fine tuned and put back […]